Master formulas & recipes of record
Publish governed master formulas with version history, the authoritative starting point for batch initiation, not a drifting printed binder.
Loading…
Solution · Digital Batch Execution & Paperless BMR
Convert paper batch records (BMR/BPR) to validated digital EBR with automated line clearance and review-by-exception
Transitioning from paper batch binders (BMR/BPR) to digital batch execution ensures 100% first-time-right manufacturing documentation. Novaqis BRM guides plant operators step-by-step with material barcode verification, weighing scale integration, real-time limit gating, and automated QA Review-by-Exception.
Product preview
Active batches, clearance due, and qualification visibility
Dashboard / Manufacturing
Dashboard
Recent batches
Capabilities
Publish governed master formulas with version history, the authoritative starting point for batch initiation, not a drifting printed binder.
Walk the run with signatures where policy requires them, material checks, yield capture, and deviation paths when investigation is needed.
Pre-batch clearance checklists and floor logbooks with proper corrections, evidence that stays with the batch record.
Right controlled document at the step, operator qualification visible before critical work, and training gates respected at release.
When QMS is licensed, holds and investigations connect to batch disposition, QA and manufacturing share one release conversation.
Compliance & control
Audit trails, electronic signatures, role-based access, and deployment choices designed for GxP validation, not bolted on after the fact.
Step completions, material additions, signatures, and corrections captured with user and timestamp for batch record review.
Operator and verifier signatures at defined steps with meaning-of-signature aligned to site batch record SOPs.
Operators, supervisors, and QA reviewers see only the steps and batches their role permits, shared identity with Admin.
Execution pulls the effective controlled copy for the step, no manual lookup for which SOP revision applies.
Run BRM inside the manufacturing network for latency and availability requirements shop-floor teams expect.
Outcomes
FAQ